[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-detail-jig-fixture-material-with-order-parts":3},{"kind":4,"cmsPost":5},"cms",{"id":6,"type":7,"slug":8,"title":9,"summary":10,"content":11,"categoryId":12,"tags":13,"authorName":14,"coverImageUrl":15,"metaTitle":16,"metaDescription":17,"metaKeywords":18,"canonicalUrl":19,"ogImageUrl":15,"jsonLd":18,"status":20,"publishAt":21,"expireAt":18,"viewCount":22,"utmCampaign":18,"conversionGoal":18,"primaryQuestion":23,"searchIntent":24,"contentCluster":25,"methodSummary":26,"reviewerName":27,"reviewerUrl":18,"reviewerBio":18,"editorialStatus":20,"factCheckedBy":28,"factCheckedAt":29,"approvedBy":28,"approvedAt":30,"workflowNote":18,"scheduledPublishAt":18,"lastPublishedAt":21,"automationSource":31,"automationExternalId":32,"workingCopy":18,"references":33,"publicationChecks":18,"contentCheckCompleted":18,"contentCheckTotal":18,"createdByAdmin":49,"createdAt":50,"updatedAt":51},13,"POST","jig-fixture-material-with-order-parts","垫块、压板这些工装料没有图纸，怎样跟订单零件一起采购？","对比工装料、备料单和零件备料数量三种做法，说明垫块、自制压板等无图夹具材料怎样挂在零件下进入采购和来料，以及填写人、工程和仓库各自要确认什么。","\u003Cp>加工订单零件要用的垫块、自制压板、治具底板，往往不在客户的图纸和零件清单里，常靠工艺人员想起来再口头交代给采购，等到装夹时才发现料没备。比较稳妥的做法是：在审核下料单时，就把这类材料作为“工装料”挂到对应零件下面，写清材料、毛坯形态、下料尺寸和数量，让它随零件一起进入采购和来料。料算支持这种无图直填，工装料不用上传图纸、不占用下料额度；但规格由填写人负责，而且要等下料单中的零件全部确认后才会进入采购。\u003C\u002Fp>\n\u003Ch2>工装料为什么容易漏\u003C\u002Fh2>\n\u003Cp>客户给的是零件图和清单，夹具怎么做是工厂自己的工艺决定。二序要几块等高垫块、压板用什么料、治具底板留多大，常由工艺员或机台师傅根据零件形状和设备临时定下，写在纸上或发在微信群里。\u003C\u002Fp>\n\u003Cp>采购整理采购清单时看不到这些信息，仓库也不知道这批料里还有夹具用料要等。常见的结果是零件毛坯到了，夹具料还没买；或者同一块垫块被两个人各报了一次。\u003C\u002Fp>\n\u003Ch2>工装料、备料单和零件备料数量的区别\u003C\u002Fh2>\n\u003Cp>除了图纸上的零件本身，下面三种做法也会把额外的材料需求带进采购，名字相近，最容易混淆（零件报废后的补料另有补料单）：\u003C\u002Fp>\n\u003Ctable>\n \u003Cthead>\n  \u003Ctr>\n   \u003Cth>情形\u003C\u002Fth>\n   \u003Cth>在料算里怎么记\u003C\u002Fth>\n   \u003Cth>之后去哪里\u003C\u002Fth>\n  \u003C\u002Ftr>\n \u003C\u002Fthead>\n \u003Ctbody>\n  \u003Ctr>\n   \u003Ctd>为加工某个零件准备的垫块、自制压板、治具料\u003C\u002Ftd>\n   \u003Ctd>在下料单审核页，给该零件加一条工装料，挂在零件下\u003C\u002Ftd>\n   \u003Ctd>下料单确认后进入采购台，带“工装料”标记\u003C\u002Ftd>\n  \u003C\u002Ftr>\n  \u003Ctr>\n   \u003Ctd>还没有对应零件、想先备着的常用材料\u003C\u002Ftd>\n   \u003Ctd>在下料单列表点击“新建备料单”，手填规格，不挂任何零件\u003C\u002Ftd>\n   \u003Ctd>提交后直接进入待采购，做法见料算教程\u003Ca href=\"\u002Ftutorials\u002Fmaterial-preparation-management\">备料的管理\u003C\u002Fa>\u003C\u002Ftd>\n  \u003C\u002Ftr>\n  \u003Ctr>\n   \u003Ctd>同一个零件要多下几件毛坯，应对试切或报废\u003C\u002Ftd>\n   \u003Ctd>在审核详情页点击“修改参数”，调整零件的“备料数量”\u003C\u002Ftd>\n   \u003Ctd>计入该零件的最终下料数量；已经报废再补的情况，见\u003Ca href=\"\u002Fblog\u002Fscrap-replenishment-after-machining\">零件报废后如何补料\u003C\u002Fa>\u003C\u002Ftd>\n  \u003C\u002Ftr>\n \u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cfigure>\n \u003Cimg src=\"https:\u002F\u002Fmedia.liaosuan.cn\u002Fpromo\u002Fblog\u002Fjig-fixture-material-with-order-parts\u002Ffixture-vs-stock-88d67270f7881760.png\" alt=\"概念示意：零件旁边放着两块铝垫块和一根钢扁条毛坯，用同一根绿色细绳与零件相连，旁边另有几根未挂零件的常用棒料和扁条\" loading=\"lazy\">\n \u003Cfigcaption>\n  图 1：概念示意。工装料与它服务的零件挂在一起进入采购，常用备料不挂零件、单独提出需求。图中的细绳和纸签只示意挂靠关系，不是料算界面或标签。\n \u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Ch2>在料算里给零件加一条工装料\u003C\u002Fh2>\n\u003Cp>工程师或管理员打开下料单的审核页，在需要夹具的零件行点击“加工装料”按钮，也就是给这个零件加一条工装料。下料单还在上传或计算时，不能添加。\u003C\u002Fp>\n\u003Cp>在“添加工装料”窗口里，归属零件已经固定。名称默认是“父件名-工装N”，建议改成能看出用途的写法，并保留“工装”二字：采购和仓库主要靠名称和规格认出这一行，采购台也能按零件名搜索。材料可以从材料库搜索，也可以直接输入自定义名称，多色材料还要选材料颜色；选定毛坯形态后，按形态填写下料尺寸；最后填写数量和备用。窗口里的“备用”就是这条工装料多下的数量，作用和零件的“备料数量”相同；数量加备用，就是这条工装料要下料和采购的件数。\u003C\u002Fp>\n\u003Cp>窗口里的“备注”只保存在下料清单中，审核页、采购台、采购单和来料入库页都看不到，只会出现在导出的下料清单 Excel 里。需要让采购、仓库或供应商看到的说明，在审核页这一行点击“＋ 添加备注”（最多 30 字），它会显示在采购单明细和导出采购单的“备注”列。\u003C\u002Fp>\n\u003Cp>以下是\u003Cstrong>演示假设\u003C\u002Fstrong>：零件“底座外壳”铣第二面时需要两块等高垫块。工程人员给它加一条工装料，名称写“底座外壳-二序工装垫块”，材料从材料库选“铝合金 6061”，毛坯形态选板材，下料尺寸填长 120、宽 80、厚 25 mm，数量 2、备用 1，这一行共下料 3 件。添加后，它以“工装料”标记显示在底座外壳下方，编号类似 1-1。在工装料进入采购单之前删除底座外壳，挂在下面的工装料会一起删除；工装料进入采购单后，底座外壳就不能直接删除了。\u003C\u002Fp>\n\u003Cfigure>\n \u003Cimg src=\"https:\u002F\u002Fmedia.liaosuan.cn\u002Fpromo\u002Fblog\u002Fjig-fixture-material-with-order-parts\u002Ffixture-modal-ui-9a0a423f35bad58f.png\" alt=\"料算审核页的添加工装料窗口：归属零件、名称、材料、毛坯形态、下料尺寸、数量与备用（演示数据）\" loading=\"lazy\">\n \u003Cfigcaption>\n  图 2：料算“添加工装料”窗口实际界面，填写内容为演示数据。\n \u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\n\u003Ch3>直填即确认，责任落在填写人\u003C\u002Fh3>\n\u003Cp>工装料不经过几何计算，也不会再单独走一遍工程审核，填进去就算确认。尺寸和材料是否合适，取决于填写人对夹具方案的判断，最好对照夹具草图或工艺卡填写，不要凭印象估。它也不会替零件做确认：下料单要等其中的零件全部确认，才会转为已确认，把零件和工装料一起送进采购台。走料算站内采购流程时，下料单已经确认之后再补加的工装料，会直接单独进入待采购；已经标记为外部采购的下料单不进入这份待采购列表。\u003C\u002Fp>\n\u003Ch2>采购和来料时，怎样认出工装料\u003C\u002Fh2>\n\u003Cp>在采购台的待采购列表里，工装料带有“工装料”标记，可以和普通零件一起按供应商生成采购单。仓库在来料入库时也会看到“工装料”标记，鼠标停在标记上会提示这是无图材料、要按规格核对收货。\u003C\u002Fp>\n\u003Cp>采购单详情和导出的采购单上，不会单独标出哪一行是工装料；采购台目前也不能只筛选工装料，料算也没有单独统计夹具用料花费的报表。需要单独核算夹具用料时，要在企业自己的台账中另行记录。合并采购、分批来料和对账的完整做法，见\u003Ca href=\"\u002Fblog\u002Fmulti-job-procurement-receiving-reconciliation\">多批零件如何合并采购并跟踪来料和对账\u003C\u002Fa>。\u003C\u002Fp>\n\u003Ch2>哪些情况不适合记成工装料\u003C\u002Fh2>\n\u003Cul>\n \u003Cli>\u003Cstrong>需要设计的复杂治具\u003C\u002Fstrong>：料算只记录材料和下料尺寸，不负责夹具结构设计或强度校核。\u003C\u002Fli>\n \u003Cli>\u003Cstrong>外购标准件\u003C\u002Fstrong>：成套机床压板、快速夹钳、定位销、螺钉等不是需要下料的毛坯，按企业现有采购方式处理。\u003C\u002Fli>\n \u003Cli>\u003Cstrong>多个订单长期共用的通用夹具料\u003C\u002Fstrong>：它不属于某一个零件，更适合用备料单提出采购需求；料算不记录库存数量，库存与工装台账仍需企业自行管理。\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Ch2>方法、适用范围与限制\u003C\u002Fh2>\n\u003Cul>\n \u003Cli>\u003Cstrong>编写方法\u003C\u002Fstrong>：2026-10-05 核对料算生产版本中的“加工装料”入口、“添加工装料”字段、确认与进入采购台的条件、额度计算方式，以及采购台和来料入库页面的工装料标记，并对照官网常见问题中的公开说明；2026-10-15 在生产界面打开“添加工装料”窗口复核字段并截图。\u003C\u002Fli>\n \u003Cli>\u003Cstrong>适用范围\u003C\u002Fstrong>：订单零件加工需要垫块、自制压板、治具底板等无图夹具材料，并希望把它们与零件一起采购和收货的机加工厂。\u003C\u002Fli>\n \u003Cli>\u003Cstrong>限制说明\u003C\u002Fstrong>：本文不涉及夹具设计、强度校核、外购标准件采购和库存管理；料算当前不记录库存数量，也不单独统计工装材料成本。\u003C\u002Fli>\n \u003Cli>\u003Cstrong>人工责任\u003C\u002Fstrong>：工程或工艺人员确认工装料的材料、尺寸和数量；工程人员确认下料单中的零件；采购确认供应商与采购单；仓库按规格核对收货。\u003C\u002Fli>\n \u003Cli>\u003Cstrong>数据边界\u003C\u002Fstrong>：零件“底座外壳”、铝合金 6061 垫块，以及截图中的名称、尺寸和数量均为演示数据，不含客户数据。封面为装夹场景示意图，不作为真实车间记录或夹具设计依据。\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Ch2>参考资料\u003C\u002Fh2>\n\u003Cul>\n \u003Cli>\u003Ca href=\"\u002Ftutorials\u002Fmaterial-preparation-management\">料算教程：备料的管理\u003C\u002Fa>\u003C\u002Fli>\n \u003Cli>\u003Ca href=\"\u002Fblog\u002Fmulti-job-procurement-receiving-reconciliation\">多批零件如何合并采购并跟踪来料和对账？\u003C\u002Fa>\u003C\u002Fli>\n \u003Cli>\u003Ca href=\"\u002Fblog\u002Fscrap-replenishment-after-machining\">零件报废后如何补料？先分清报废数量、补料数量和复核责任\u003C\u002Fa>\u003C\u002Fli>\n \u003Cli>\u003Ca href=\"\u002Fblog\u002Fautomatic-blanking-engineering-review-checklist\">自动算出毛坯以后，还要审核什么？工程确认清单\u003C\u002Fa>\u003C\u002Fli>\n\u003C\u002Ful>",5,"工装夹具,工装料,垫块,压板,无图材料,材料采购","料算产品与工程团队","https:\u002F\u002Fmedia.liaosuan.cn\u002Fpromo\u002Fblog\u002Fjig-fixture-material-with-order-parts\u002Ffixture-cover-fe52dc49f166710f.png","工装夹具料没有图纸怎么采购？垫块压板随零件下单｜料算","垫块、自制压板等工装夹具料不在客户图纸里，容易漏买。说明工装料、备料单与零件备料数量的区别，以及在料算中挂到零件下随零件采购、来料的方法和确认责任。",null,"https:\u002F\u002Fliaosuan.cn\u002Fblog\u002Fjig-fixture-material-with-order-parts","PUBLISHED","2026-10-15T07:52:40.162673Z",71,"加工订单零件需要的垫块、压板、治具底板等工装夹具料没有图纸时，怎样随零件一起登记规格、确认并采购？","工装夹具无图材料的登记与采购","无图材料与工装用料","2026-10-05 核对料算生产版本中“加工装料”入口、“添加工装料”字段、直填即确认与进入采购台的条件、额度计算，以及采购台和来料入库中的工装料标记，并对照官网常见问题；2026-10-15 在生产界面复核“添加工装料”窗口字段并截图；示例零件、尺寸与截图填写内容为演示数据。","料算产品负责人","admin_000000000001","2026-10-15T07:52:38.158563Z","2026-10-15T07:52:39.240174Z","weekly-seo-planner","seo-2026w41-tue-new-01-jig-fixture-material",[34,40,43,46],{"title":35,"url":36,"publisher":37,"visitedAt":38,"verified":39},"料算教程：备料的管理","https:\u002F\u002Fliaosuan.cn\u002Ftutorials\u002Fmaterial-preparation-management","料算","2026-10-05T00:00:00Z",true,{"title":41,"url":42,"publisher":37,"visitedAt":38,"verified":39},"多批零件如何合并采购并跟踪来料和对账？","https:\u002F\u002Fliaosuan.cn\u002Fblog\u002Fmulti-job-procurement-receiving-reconciliation",{"title":44,"url":45,"publisher":37,"visitedAt":38,"verified":39},"零件报废后如何补料？先分清报废数量、补料数量和复核责任","https:\u002F\u002Fliaosuan.cn\u002Fblog\u002Fscrap-replenishment-after-machining",{"title":47,"url":48,"publisher":37,"visitedAt":38,"verified":39},"自动算出毛坯以后，还要审核什么？工程确认清单","https:\u002F\u002Fliaosuan.cn\u002Fblog\u002Fautomatic-blanking-engineering-review-checklist","automation:weekly-seo-planner","2026-10-15T06:41:12.078914Z","2026-10-15T07:52:40.164766Z"]